Pick up sticks

Dig Day saw a group of committed members first repair a damaged berm, clear a Freeride trail corridor, then make a long to-do list before scoping out an XC trail corridor and picking up some litter.

Doesn't sound like much but collectively we made two massive piles of branches, sticks and falled trees, filled two large bin bags full of litter, and came up with long list of things that we could do to improve or repair the existing trails, not to mention all the ideas for new...

It was great to see some new faces, and encouraging to see everyone get stuck in to the not-so-glamourous (but absolutely essential) side of trail building.

Thanks to all those who helped out, please check out the Forum over the next couple of days for details of the new trails and the to-do list to find out how to get involved.

Leave a Comment